Location
Morwell, VIC
Client
AusNet Services
Sector
Power Infrastructure
Completed
July 2024
Scope of Works
Pile cap reinforcement and switchyard hardstands across 17 tower sites and two substations.
Challenges
Remote sites with limited access windows around energised infrastructure.
Outcomes
Extended asset design life by an estimated 40+ years through full composite reinforcement.
Corrosion-resistant FRP works for 220kV transmission line foundations and substations.